A high-performing solar power plant is built on rigorous structural and electrical engineering. Explore EKOSYS Corporation's 10-step installation protocol designed for Bihar's weather and grid conditions.

Trained Electrical & Structural EPC Crew
Equipped with calibrated torque tools, multimeters & safety harnesses.
Structured Quality Assurance
From initial 3D shadow analysis to DISCOM net-meter synchronization and mobile telemetry handover.
Our engineers inspect roof orientation, parapet wall shadows, structural load-bearing capacity, and cable pathways using precision clinometers.
Shadow mapping & True South roof orientation check
MNRE Technical Guidelines
Every step is documented in your Client Engineering Dossier with photos & test reports.
Engineering Protocols
How our mechanical and electrical specifications ensure your system operates safely across 30+ years.
Mounting superstructures engineered according to IS 875 Part 3 wind load standards to withstand severe North Bihar storm gusts.
Dedicated maintenance-free earth pits bonded with bentonite compound to ensure rapid fault current dissipation and equipment safety.
Chemical anchoring with 3-layer UV-resistant polyurethane waterproofing prevents any moisture penetration on flat concrete terraces.
Formal inspection conducted in the presence of DISCOM officials with signed commissioning certificate uploaded for DBT subsidy clearance.
Installation Portfolio
From residential homes to commercial and industrial rooftop projects.

Hajipur, Vaishali, Bihar · 10 kW Grid-Tied System
Designed on a residential rooftop in Hajipur, this elevated installation powers multiple air conditioners while leaving the entire terrace completely usable for family gatherings.

Patna, Bihar · 50 kW Three-Phase Plant
A commercial healthcare and diagnostics center equipped with a high-yield solar array that slashes daytime grid consumption by over 75%.

Vaishali District, Bihar · 5 kW Net-Metered System
Turnkey residential solar installation delivered with full National Portal subsidy assistance and rapid DISCOM net-meter commissioning.

North Bihar Industrial Area · 100 kW Captive Power Plant
Engineered on an industrial metal warehouse roof without puncturing sheet membranes, saving hundreds of thousands of rupees in monthly industrial power tariffs.

Muzaffarpur & Saran, Bihar · Multi-Site Solar Maintenance
Proactive maintenance contract restoring 18% lost generation through specialized de-mineralized washing and precision inverter optimization.

Hajipur Town, Bihar · 3 kW On-Grid System
A compact 3 kW residential setup for an independent family home, offsetting 100% of standard household utility bills with up to ₹1,13,000 total subsidy benefit.
Installation Queries
Have questions about roof structural suitability, meter testing, or earthing in Hajipur or Vaishali?
The physical rooftop installation typically takes 2 to 4 days for a standard 3 kW to 10 kW system. The entire process—including DISCOM feasibility approval, structural erection, and bi-directional net meter commissioning—generally takes 3 to 4 weeks depending on utility inspection schedules.
No. For flat concrete RCC roofs, EKOSYS uses high-strength chemical anchor fasteners with multi-layer bituminous epoxy sealing, or pre-cast concrete ballast foundations that do not penetrate the roof membrane at all. Every installation is thoroughly water-tested.
An elevated solar structure elevates the solar array 7 to 9 feet above the roof floor, creating a covered canopy. This allows you to retain 100% of your terrace space for walking, recreational use, or clothes drying while keeping the top floor significantly cooler in summer.
Every system includes Class-I/II Surge Protection Devices (SPDs) in both DCDB and ACDB boxes, miniature circuit breakers (MCB/MCCB), a dedicated Class-A copper Lightning Arrestor (LA), and dual copper-bonded chemical earthing electrodes tested below 5 Ohms.
EKOSYS Solar Consultation · Bihar
Contact EKOSYS for a site survey, 3D shadow analysis, and turnkey installation in Hajipur, Patna, and across Bihar.