World-class solar hardware is only as good as the installation team that puts it together. EKOSYS provides safety-first, standard-compliant solar engineering following MNRE and CEA guidelines—guaranteeing clean workmanship, zero leakage, robust wind resistance, and smooth net-metering synchronization.
Target Applications
We align system sizing, structural orientation, and electrical engineering with your property type and load profile.
Ideal For:

100% MNRE & CEA Compliant Execution
Engineered for Bihar's climate with 30-year reliability*.
Core Advantages
Why our engineering approach delivers higher kilowatt-hour generation and lower lifetime degradation.
Trained solar engineers adhering to MNRE, IS 875 (wind load), and Indian Electricity Rules
Dedicated chemical earth pits with tested resistance below 5 Ohms and Class-I Lightning Protection
Concealed, UV-resistant PVC/GI conduit cable routing with zero exposed loose wiring
Complete facilitation of DISCOM net meter inspections, approvals, and subsidy disbursal
Precision EPC Standards
Our civil and electrical specifications ensure that every joint, fastener, and cable pathway meets Indian Electricity Rules.
Hot-dip galvanized superstructures (80+ microns zinc) engineered to withstand 150 km/h gale gusts across North Bihar plains.
Dedicated earth pits with bentonite compound dissipate fault currents instantly to safeguard inverters and home appliances.
Double-insulated UV-resistant XLPO solar DC cables routed inside heavy-gauge PVC conduits with zero loose roof wiring.
Chemical anchor fasteners and bituminous elastomeric waterproofing eliminate moisture seepage risks on RCC slabs.
Formal verification with NBPDCL / SBPDCL electrical inspectors for bidirectional net meter synchronization.
Wi-Fi monitoring app setup with complete handover kit, single-line diagrams, and warranty documentation.
Step-by-Step Delivery
Every project follows a disciplined sequence to ensure safety, structural rigidity, and swift DISCOM net-meter clearance.
Bill of Materials (BOM)
We provide complete transparency with itemized equipment datasheets before project initiation.
Questions & Answers
Have specific questions about installation services, government subsidies, or technical warranties?
Physical on-site installation for a standard 3 kW to 10 kW residential system takes 2 to 4 days. The complete timeline, including DISCOM feasibility approval, statutory inspection, and bi-directional net meter installation by NBPDCL/SBPDCL, typically spans 2 to 4 weeks.
No. For flat concrete roofs, we use chemical anchor fasteners with multi-layer bituminous epoxy waterproofing, or pre-cast concrete ballast blocks that do not penetrate the roof membrane at all. Every mounting point is thoroughly sealed and water-tested.
Upon commissioning, you receive a complete Handover Kit containing equipment warranty certificates (30-Year Warranty* on modules, 5-8 year inverter warranty), single-line electrical diagrams (SLD), test reports, net meter paperwork, and mobile monitoring app login credentials.
Explore More Verticals
Discover other complementary clean-energy solutions provided by EKOSYS.
EKOSYS Solar Consultation · Bihar
Talk to the EKOSYS engineering team in Hajipur for an honest, site-aware assessment and PM Surya Ghar subsidy guidance.